Please use this identifier to cite or link to this item: https://elib.psu.by/handle/123456789/36985
Full metadata record
DC FieldValueLanguage
dc.contributor.authorHramyka, S.ru_RU
dc.contributor.authorShnitko, S.ru_RU
dc.date.accessioned2023-01-09T08:35:29Z-
dc.date.available2023-01-09T08:35:29Z-
dc.date.issued2017
dc.identifier.citationHramyka, S. Recovery altitude setting-out base of construction of Polotsk hydroelectric power station / S. Hramyka, S. Shnitko // European and National Dimension in Research = Европейский и национальный контексты в научных исследованиях : electronic collected materials of IX Junior Researchers' Conference, Novopolotsk, April 26-27, 2017 : in 3 parts / Ministry of Education of Belarus, Polotsk State University ; ed. Dr. Dzmitry Lazouski [et al.]. - Novopolotsk : PSU, 2017. - Part 3 : Technology. - P. 148-151.ru_RU
dc.identifier.urihttps://elib.psu.by/handle/123456789/36985-
dc.description.abstractWe consider the problem of recovery altitude setting-out base of construction and give calculations of the required accuracy location survey and describe the field and office work.ru_RU
dc.language.isoenru_RU
dc.publisherПолоцкий государственный университетru_RU
dc.titleRecovery altitude setting-out base of construction of Polotsk hydroelectric power stationru_RU
dc.typeArticleru_RU
dc.citation.spage148ru_RU
dc.citation.epage151ru_RU
Appears in Collections:European and National Dimension in Research. Technology. 2017

Files in This Item:
File SizeFormat 
148-151.pdf132.89 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.